Back to the Basement: Getting up to speed again after some outside work

< 1 min readHaving taken a little break, it’s time to get back to work.  I had a little trouble positioning myself on the “what’s next list” so I worked backwards:

Having taken a little break for, first, the MREA, and then successive visits from my BFF and a group of out-of-town family, it’s time to get back to work.  I had a little trouble positioning myself on the “what’s next list” so I worked backwards:  Continue reading “Back to the Basement: Getting up to speed again after some outside work”

Exterior Progress: Nearly done with North and South Gable Ends

6 min readI spent the (spectacularly hot) week of my birthday pushing forward on the painting progress.  Knowing I’d have someone around to spot me, I planned to do the high-up, platform work on the south gable. 

I got started on re-painting the house last fall right after we the sale closed.

The tired green color and peeling paint were about equally unappealing to me and I wanted them gone.  Plus I wanted to get some plantings in to replace the hedge I tore out and I knew that new plants wouldn’t appreciate drop cloths, ladders and the general tramping around that painting a house takes.

I knew it was going to be a tough job, made a little tougher by the lead paint underneath the green – which meant I’d need to follow proper safety procedures when scraping and sanding and the year was getting cold fast so I committed to just doing the front face of the house – the east – for the fall and coming back to the rest this year.

Continue reading “Exterior Progress: Nearly done with North and South Gable Ends”

Progress: Pouring the Concrete Slab was Pretty Easy!

4 min readI poured a mother freaking 28 square foot concrete slab in the basement this week … and it really wasn’t that hard. Here’s how I did it (hint: I roped my parents into some of the extra manual labor!)

I admit, this was one of the tasks I’ve been most excited about … and afraid of.  I could, of course, have asked the plumbers to repair the slab they tore up when their work was done but I’ve never worked with concrete before and wanted the chance to try my hand.  When I saw the size of the hole I had a few second thoughts in the end it was a really fun time to fill it back in.

With the right tools (another post) the job was really pretty simple. Continue reading “Progress: Pouring the Concrete Slab was Pretty Easy!”

Progress: There is a Huge Hole in the Basement to get at the Under-Slab Plumbing

2 min readTwo weeks ago I took the most dramatic step yet in bringing the basement plans to fruition.  A crew of plumbers showed up at 8 in the morning with jack hammers and tore up a big patch of concrete slab in the basement.  

This is step one of removing the ridiculous open-to-the-laundry toilet and shower arrangement.  They carted off the broken basement floor chunks, removed the old plumbing and then did  the underground rough in for the new 3/4 bathroom. Continue reading “Progress: There is a Huge Hole in the Basement to get at the Under-Slab Plumbing”

Progress: Basement Measuring, Mockups and Making Final Checks

2 min readWith the plumbers incoming the next day to tear out the concrete slab and old pipes, and lay new ones, time for a good old fashioned mock-up with blue tape lines and visualize it one more time.

Having finally (mostly) cleared the deck in the basement I took a moment to revel in the bare walls, exposed floor joists overhead and swept-clean floor.  Then I got out my laser measure, a pair of tape measures, a sharpie and a roll of blue painters tape and marked the location of the new bathroom walls (and fixtures) on the basement floor. Continue reading “Progress: Basement Measuring, Mockups and Making Final Checks”

Minimizing Waste in Demoltion

3 min readAny remodeling project is inherently more or less wasteful. “Out with the old and in with the new” means that something is being tossed and new resources are being consumed. Here are the steps I took to keep limit the landfill content produced by my basement demolition.

From an ethical standpoint, I think remodeling is better than building new and even remodeling should always be justified by improving utility and energy efficiency to offset that waste.  From a design point of view, the new work should be not only more aesthetically pleasing but more multi-functional – future proofed as much as possible.

I apply these ideas to all the design work I do, and I’ve been trying to use the same principles during my physical remodeling here. Continue reading “Minimizing Waste in Demoltion”

Progress: Basement Demolition and Discoveries

4 min readAfter a long winter of being distracted by design work and other projects, I got back to the fun of tearing apart the house again a few weeks ago.

[Actually I began some exploratory demolition by pulling down a few ceiling tiles at the end of January, only to be delayed by a the sudden memory that the building inspector hadn’t NOT said that the ugly acoustic tile ceiling could contain asbestos.  I decided to play it safe and took a sample over to the Wisconsin State Lab of Hygiene for testing to confirm that it was safe.  Thirty eight bucks and three weeks later I got the all clear and was ready to head back down the basement stairs.] Continue reading “Progress: Basement Demolition and Discoveries”

Micro Update: DIY Frosted Glass House Numbers

2 min readSometimes when you can’t decide on either the high, or the low, version of available products, the only option is to DIY.

When I painted last fall, I stripped off the mailbox, lights and house numbers.  I’ve got the new box and lights in place but was having a hard time deciding on the right kind of numbers.  The commercial options were either blah, or a little pricy for my budget.

Here’s how I split the difference and created my own solution.  It highlights the original mid-century front door, enhances privacy, simplifies the entry and glow cheerily at night. Continue reading “Micro Update: DIY Frosted Glass House Numbers”

Micro Update: High/Low Mailbox and Entry Lights

2 min readFans of modernism all know that sometimes you have to pay through the nose for minimalism and great design … and sometimes you get away with the cheapest option in the shop. In this case, it was both.

I removed the original lights, house numbers and mailbox when during the painting process and could never bring myself to put them back on the house.  I went through several weeks where the poor postman had to deliver to a the old box propped on the stoop. Continue reading “Micro Update: High/Low Mailbox and Entry Lights”

Going Grey, or it’s not easy to Paint outside in the swing seasons

2 min readI wanted to squeak in one quarter of the house painting – the street side – before the weather got too cold for proper curing conditions. Here’s how I gamed the weather to get the job done!

Modern paint technology is pretty miraculously forgiving of weather conditions but there are still limits to the times of day and year that you can effectively get paint to stick to outside surfaces.

Since we wanted to get at least the front of the house painted in the fall, we found ourselves playing with two very important metrics for the paint – temperature and humidity. Continue reading “Going Grey, or it’s not easy to Paint outside in the swing seasons”